The run sheet is for everyone with a responsibility on event day. The project manager uses it as the main overview. The technical director consults the AV specs and timing. The production lead manages the run sheet and checklists.
The facilities manager works with the venue details and breakdown list. The MC has the time schedule and the speaker overview. Every team member gets their own relevant section, not everything for everyone.